Guide · Efficiency

Voltage optimisation:

what it is and when it pays

Bringing grid voltage down to what your equipment needs can cut waste on every unit you buy.

In short

The quick answer.

Bringing grid voltage down to what your equipment needs can cut waste on every unit you buy.

  • Best for motor-heavy sites
  • Logging survey shows the saving
  • Works alongside solar

What it is

Voltage optimisation brings incoming grid voltage down to what your equipment needs.

When it pays

  • Motor-heavy sites
  • Sites with high incoming voltage
Every unit you still buy goes further.

Next steps

A short voltage logging survey shows the likely saving.

Key facts

Three things to know.

Less waste

Equipment runs at the voltage it was designed for.

Longer life

Lower voltage reduces wear on motors and lighting.

Quick install

Usually one short planned shutdown.

Related guides

Keep reading.

FAQs

Questions about this guide.

How long does a survey take?
Usually under two hours on site, plus a review of your meter data.
No. The survey and proposal are free with no obligation.
Only briefly. We switch over in a planned downtime window.

Find out what your site could save.

Free, no obligation, based on your real usage.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.